Monolithic reinforced concrete work for a three-level commercial building, including one below-grade level. The scope included construction of isolated reinforced concrete footings for structural columns and installation of a continuous reinforced concrete tie beam along the existing load-bearing walls to strengthen and integrate the building structure.
Describe the job and send a few photos — that's enough to get started.