Full renovation and reinforcement of an existing 20x16 ft cracked concrete slab: L-shaped reinforced concrete foundation footing dug roughly three feet deep, rebar and monolithic slab pour tied into the existing structure, and a geotextile/crushed-stone drainage system, prepping the base for Italian Travertino tile. Photos show the excavation, rebar and drainage stages through to the finished travertine patio.

Want work like this at your place?

Describe the job and send a few photos — that's enough to get started.