Structural build of a 15x15 ft elevated deck, including framing/inspection, removal of an existing window, cutting in a new doorway opening, installing a new door, and installing a metal railing (unpainted at time of photos). Photos show the rough brick opening before the door was installed alongside the completed framing and door.

Want work like this at your place?

Describe the job and send a few photos — that's enough to get started.