Structural build of a 15x15 ft elevated deck, including framing/inspection, removal of an existing window, cutting in a new doorway opening, installing a new door, and installing a metal railing (unpainted at time of photos). Photos show the rough brick opening before the door was installed alongside the completed framing and door.
Describe the job and send a few photos — that's enough to get started.